Does business interruption insurance cover a power outage in NZ?
Under Vero's BusinessPlan policy (VBWBSP 07/24), business interruption from a power or other utility outage is covered only where the outage results from damage to the electricity station, sub-station or power lines (or the other utility works listed in the Contingent business interruption extension) that supply you, and the first 24 hours of loss are not paid. An outage without damage to those works is not described as covered.
This answer is about one insurer's published wording. Other insurers' wordings differ, and your own policy schedule decides what you are covered for. General information only, not advice.
What the wording says
Damage to any: (i) electricity station or sub-station or power lines; (ii) gas works or natural gas works or gas storage facilities of any gas distributor and any pipe lines of any supply authority (but excluding the Maui and any other off-shore installations and the Kapuni installation); (iii) waterworks or water treatment plants and any pipe lines of any public supply authority; (iv) sewerage works or sewerage treatment plants and any pipe lines of any public supply authority; or (v) telecommunication lines or cables that are directly connected to the premises shown on the schedule; from which you receive or send electricity, gas, natural gas, water, sewage or telecommunications.
will not exceed 10% of the sum insured or limit applicable to any item and/or situation insured by this business interruption section or $1,000,000 in total, whichever is the lesser. ... For any claim under this extension with the exception of a claim under (b) closure of transport routes, and a claim arising out of natural disaster, we will not pay for the first 24 hours of your loss.
Quoted verbatim; "..." marks text left out. Quotes checked against the insurer's PDF on 15 November 2026.
What this means in practice
- The trigger is damage to the listed supply works, not the loss of supply itself. A cut where nothing in those works is damaged does not fit the wording of this extension.
- Telecommunications count only for lines or cables directly connected to the premises shown on your schedule.
- You carry the first 24 hours of loss. Where the cause is a natural disaster, the period is 21 days and this extension applies only if additional extension BI031 is on your policy.
- Separately, the Material Damage and Business interruption sections both exclude damage directly caused by interruption of the supply to the site of water, gas, electricity or any fuel.
Conditions and limits in the wording
Limits and excesses below are the insurer's, as printed in the wording. Your schedule can show different amounts. They are not premiums.
- Limit: the lesser of 10% of the sum insured or limit for the item and/or situation, or $1,000,000 in total, for any one loss and for all losses from one event. The extension does not increase the section’s overall maximum liability. (BusinessPlan Policy Wording VBWBSP 07/24: Business interruption, Automatic extension 5)
- Time excess: the first 24 hours of loss are not paid (7 days for closure of transport routes, 21 days for natural disaster). The indemnity period begins when that period expires, not when the damage occurs. (BusinessPlan Policy Wording VBWBSP 07/24: Business interruption, Automatic extension 5)
- For natural disaster loss, the extension applies only if additional extension BI031 applies to your policy. (BusinessPlan Policy Wording VBWBSP 07/24: Business interruption, Automatic extension 5)
- Both sections exclude damage directly caused by interruption of the supply to the site of water, gas, electricity or any fuel. (BusinessPlan Policy Wording VBWBSP 07/24: Material Damage Exclusions 6.2(h); Business interruption Exclusions 5.2(h))
Other insurers, and your own policy
This page quotes only Vero Insurance New Zealand Limited's BusinessPlan Policy Wording (VBWBSP 07/24). Other insurers' wordings use different clauses, limits and exclusions, and Vero may change its wording at a later edition. Extensions marked as additional apply only if your schedule says they do. Your policy schedule, together with the wording it names, decides what you are covered for.
This is general information about a published policy wording, not financial advice, and it does not tell you whether a policy suits your business. SmallBusinessInsurance.co.nz is operated by Evolve Group Limited (FSP711891), a licensed Financial Advice Provider. Business-insurance enquiries are referred to Blanket Advice Limited (FSP1004126), a separately licensed Financial Advice Provider, who provide the regulated advice and place the cover.
Follow-up questions
Is a planned power cut covered by business interruption?
The wording does not describe it as covered. The Contingent business interruption extension responds to damage to the listed supply works. Whether a particular outage involved such damage is a question for the insurer on the facts of the claim.
How long before business interruption cover for an outage starts paying?
Under this extension the first 24 hours of loss are not paid. For a natural disaster the period is 21 days, and for closure of transport routes it is 7 days. The indemnity period starts when that period ends.
Related pages
Content reviewed 15 November 2026. General information only, not personalised financial advice.